Vitocrossal 300 CA3B | Installation & Start Up/Commissioning

Products:

Vitocrossal 300 CA3B, Vitocrossal 200 CI2

  • Intermediate
  • 7 Modules
  • 3:45 hours

Course Overview

This class is for licensed contractors or service technicians that have been working with the Vitocrossal 300 CA3B. Or those who have attended an entry level CA3B Product overview class. This class will cover detailed information of all aspects of installation (piping, venting, gas supply, wiring, programming) and startup. This class will also cover how to Cascade the burners. There will be hands on portions for control programming and boiler commissioning via the HMI. Prior experience with condensing boiler installations or service is required.

Standard Modules

  • 6 Modules
  • 3:30 hours
Piping - Application Guide | Vitocrossal 300 CA3BIntermediate
Log In

Log in to request courses

Learning Objectives:

  1. Describe the process for removing boiler from pallet and final location selection
  2. Explain how to connect to the boiler by listing pipe sizing
  3. Explain the importance of piping strategy and when to use Primary / secondary 
Wiring | Vitocrossal 300 CA3BIntermediate
Log In

Log in to request courses

Learning Objectives:

  1. Identify the line voltage plug numbers and terminal location (Show our numbering system)
  2. Describe the different sensors, their functions and locations
  3. Identify DIN rail connections and optional equipment
Boiler Details | Vitocrossal 300 CA3BIntermediate
Log In

Log in to request courses

Learning Objectives:

  1. Describe the new boiler sizes 
  2. Explain how to choose the correct additional components
  3. List unique selling points of the CA3B
Combustion Setup | Vitocrossal 300 CA3BIntermediate
Log In

Log in to request courses

Learning Objectives:

  1. List the combustion testing procedure
  2. Describe the process for individual and all burners
  3. Explain why proper setup is important
Venting | Vitocrossal 300 CA3BIntermediate
Log In

Log in to request courses

Learning Objectives:

  1. Describe the 3 types of venting (single pipe, two pipe, common venting)
  2. Explain how to determine equivalent vent lengths - (for all 3 types of venting)
  3. Explain the importance of the Exhaust Vacuum Relief Damper and when/where it should be installed
Gas Supply & Burner | Vitocrossal 300 CA3B Intermediate
Log In

Log in to request courses

Learning Objectives:

  1. List the gas pressure requirements for natural gas and propane
  2. Describe how to do a fuel conversion
  3. Explain why proper gas pipe sizing and regulator selection are important

Add-on Modules

  • 1 Module
  • 15 mins
Versatronik 503 Communication BridgeIntermediate
Log In

Log in to request courses

Learning Objectives: 

  1. Identify the Intended use of the Versatronik 503 Control
  2. Explain the Wiring Protocol for LON to CANbus (E-Series) Communication
  3. Illustrate the Communication Possibilities to Legacy B2HB / CM2 Models
Products Covered in this Training
  • Vitocrossal 300 CA3B
  • Vitocrossal 200 CI2